Tamerlane’s Pine Point Project (PPP) will extract one million tonnes from the Pine Point Property’s R190 zinc/lead deposit utilizing an innovative combination of basic and technical mining methods. Mining the R190 deposit will confirm the use of:

• A portal / decline for ore body access and underground bulk mining
• Freezing for groundwater control
• Truck haulage of ore
• Dense Media Separation (DMS) for upgrading low grade deposits